| Description |
This is a new contract to demolish the existing power distribution system at the Yerington Complex and replace it as per engineered drawings. Work will begin with the demolition of existing equipment to include the removal of all existing electrical components. After all electrical components have been removed, any damage to the block wall must be repaired before new equipment can be installed. Vendor will supply and install all new equipment, i.e. distribution panel, panels, distribution boxes, electrical boxes, conduit, wire, etc. |